§ 26-31. Application procedures.  


Latest version.
  • (a)

    All applications for City public right-of-way use permits, accompanied by the appropriate fee, and including four (4) sketches, plans or drawings of the proposed construction or alteration, shall be submitted to the City Manager or designee. All construction within City public rights-of-way shall conform to and meet the technical specifications of the City and/or land development regulations, as applicable. Applications for access to or construction within State road rights-of-way shall be submitted to the Florida Department of Transportation.

    (b)

    All applications for City public right-of-way use permits submitted by the owner or permittee, his engineers or legal representative, shall contain the following:

    (1)

    Name, address, including zip code, and telephone number of the owner and permittee, and his or their engineers.

    (2)

    Name, address, including zip code, and telephone number of the applicant's authorized agent for permit application coordination, together with proof of authorization.

    (3)

    General description of the proposed project, its purpose and intended use, including a description of the nature and type of construction; composition, etc.; date when the activity is proposed to commence and approximate date when the proposed activity will be completed; including legal description, or street address and approximate nearest mile marker and key; and an explanation or detailing of any additional information reasonably required by the City Manager or designee, including, as applicable, survey drawings, aerial photographs, topographic maps, soil percolation test, etc.

    (4)

    Four (4) copies of sketches, plans or drawings of the proposed construction or alterations showing project location; location within the right-of-way; and typical cross-sections of topographical and drainage details showing existing utilities, underdrains, culverts, headwalls, driveways or any other existing structures, if affected by the activity, together with all proposed structures, modifications and activities when deemed necessary by the City Manager or designee. All drainage structures shall be constructed in accordance with the County technical specifications of the City and applicable land development regulations. The drawings shall be drawn to scale, or otherwise prepared so as to reasonably depict the activity and shall show a north arrow for orientation.

(Code 1999, § 16-22)